Steel Structures · Reference project

Turbine Transport Fixture

Design and safety engineering of a transport fixture for a heavy turbine assembly.

Mechanical design · Strength verification · Risk assessment6 project images

Project overview

Turbine Transport Fixture: task, engineering and implementation.

A documented fixture was developed for secured road transport and suspended handling of a heavy turbine assembly.

Turbine Transport Fixture — engineering project view
01

Task & constraints

Lifting points, chain and rope forces, self-weight, wind loads and foreseeable misuse had to be considered for transport and lifting operations.

02

Engineering

The work covered load-support and attachment points, force calculations, strength verification, risk assessment and operating instructions.

03

Technical implementation

Interfaces were coordinated with the transport vehicle, lifting equipment and intended handling sequence.

04

Result

A verified transport solution with defined lifting points and documented measures for safe road and suspended transport.

Turbine Transport Fixture — engineering project view
Turbine Transport Fixture — engineering project view

Project scope

Engineering deliverables and technical data.

A concise overview of the documented project scope.

01

Engineering deliverables

  • Transport concept
  • Strength verification
  • Risk assessment and documentation
02

Technical data

Frame mass
3’000 kg
Pump mass
10’000 kg
Cover mass
5’000 kg
Payload
15’000 kg

Engineering highlights

Key aspects of this project.

The most relevant engineering points at a glance.

01

Road and suspended transport considered

02

Calculated lifting and attachment points

03

Risk assessment and operating instructions

Your project

Planning a new system, service or modernization?

We discuss requirements, the existing installation and the appropriate engineering scope personally and confidentially.